موضوع الشراء MIC2 intend to deploy Web Application Firewall (WAF) with high redundancy (2 hardware) to protect its infrastructure – physical appliance
ملخص الشراء :
  • Bidder should provide complete Design and plan for the solution
  • Bidder is responsible for solution installation and implementation.
  • Bidder is responsible for provisioning, testing and system integration.
  • Bidder is responsible for migration from existing WAF applications.
  • Bidder is responsible complete equipment supply and delivery.
  • Bidder must ensure validation of system integration with various systems used.
  • Bidder must submit 3 years roadmap highlighting the committed features
  • Vendor should have at least 5 references in similar deployment
  • Bidder must provide 3 reference for implementation of the solution in similar environment
  • Bidder must specify where the solution has been integrated and what are the implemented use cases
  • Bidder must submit responsibility matrix, including human resource requirements.
  • Bidder must submit global and provisional acceptance test procedures.
  • Bidder must provide validation of system integration with various systems used.
  • Bidder must provide extended maintenance and support/warranty.
  • Bidder must provide on-site assistance after the final acceptance.
  • Bidder must have back-to-back support from the vendor
  • Bidder must be willing to demonstrate the various system elements of the solution.
  • Bidder must also be prepared to give a presentation of the solution if required.
  • Bidder should provide details of relevant operational reference sites.
  • Bidder must provide Gartner report for 2024 concerning the proposed product.
دراسات الشراء :
معايير الاستدامة :
الأنظمة التفضيلية الوطنية :
نوع الشراء : لوازم / سلع
القطاع : معلوماتية - تقديم تجهيزات
معلومات الاتصال
الاسم المسؤول :
هاتف : 03792243
البريد الإلكتروني :
إجراءات التلزيم
طريقة الشراء : مناقصة عمومية
معيار التلزيم : عناصر مفاضلة / معايير تقييم
المبررات :
طريقة الشراء مناقصة عمومية
ملخص الشراء
  • Bidder should provide complete Design and plan for the solution
  • Bidder is responsible for solution installation and implementation.
  • Bidder is responsible for provisioning, testing and system integration.
  • Bidder is responsible for migration from existing WAF applications.
  • Bidder is responsible complete equipment supply and delivery.
  • Bidder must ensure validation of system integration with various systems used.
  • Bidder must submit 3 years roadmap highlighting the committed features
  • Vendor should have at least 5 references in similar deployment
  • Bidder must provide 3 reference for implementation of the solution in similar environment
  • Bidder must specify where the solution has been integrated and what are the implemented use cases
  • Bidder must submit responsibility matrix, including human resource requirements.
  • Bidder must submit global and provisional acceptance test procedures.
  • Bidder must provide validation of system integration with various systems used.
  • Bidder must provide extended maintenance and support/warranty.
  • Bidder must provide on-site assistance after the final acceptance.
  • Bidder must have back-to-back support from the vendor
  • Bidder must be willing to demonstrate the various system elements of the solution.
  • Bidder must also be prepared to give a presentation of the solution if required.
  • Bidder should provide details of relevant operational reference sites.
  • Bidder must provide Gartner report for 2024 concerning the proposed product.
الموعد النهائي لتقديم العروض 2025-07-22 09:30:00
موعد جلسة فتح العروض الإدارية والفنية 2025-07-22 09:31:00
مكان استلام دفتر الشروط
سعر دفتر الشروط LBP
ملفات مرفقة

المجموعات

موضوع الشراء
عنوان المجموعة المجموعة (1) - MIC2 intend to deploy Web Application Firewall (WAF) with high redundancy (2 hardware) to protect its infrastructure – physical appliance
ملخص الشراء
  • Bidder should provide complete Design and plan for the solution
  • Bidder is responsible for solution installation and implementation.
  • Bidder is responsible for provisioning, testing and system integration.
  • Bidder is responsible for migration from existing WAF applications.
  • Bidder is responsible complete equipment supply and delivery.
  • Bidder must ensure validation of system integration with various systems used.
  • Bidder must submit 3 years roadmap highlighting the committed features
  • Vendor should have at least 5 references in similar deployment
  • Bidder must provide 3 reference for implementation of the solution in similar environment
  • Bidder must specify where the solution has been integrated and what are the implemented use cases
  • Bidder must submit responsibility matrix, including human resource requirements.
  • Bidder must submit global and provisional acceptance test procedures.
  • Bidder must provide validation of system integration with various systems used.
  • Bidder must provide extended maintenance and support/warranty.
  • Bidder must provide on-site assistance after the final acceptance.
  • Bidder must have back-to-back support from the vendor
  • Bidder must be willing to demonstrate the various system elements of the solution.
  • Bidder must also be prepared to give a presentation of the solution if required.
  • Bidder should provide details of relevant operational reference sites.
  • Bidder must provide Gartner report for 2024 concerning the proposed product.
نسبة التثقيل
الوحدة
المفردات الشائعة في المشتريات معدات الراديو والتلفزيون والاتصالات والاتصالات ذات الصلة
قطاع الشراء معلوماتية - شراء برامج
معيار التلزيم عناصر مفاضلة / معايير تقييم
تاريخ التسليم لم يحدد
تاريخ الإستلام النهائي لم يحدد
معيار التلزيم عناصر مفاضلة / معايير تقييم
معلومات الاتصال
الاسم المسؤول
منصب الشخص المسؤول
هاتف 03792243
البريد الإلكتروني
الميزانية
العملة USD
القيمة التقديرية /
مدة صلاحية العرض 210 يوم
مدة صلاحية ضمان العرض 238 يوم
العملة USD
قيمة ضمان العرض 300.00 /
مكان التسليم
مكان استلام دفتر الشروط
أماكن التنفيذ
المراحل
التخطيط
الاعلان
التلزيم
التعاقد
التنفيذ